data-dictionary

FPSADMIN.ETP_TOOL_E10_PD_HIST

Data Dictionary

>

FPSADMIN Tables

> FPSADMIN.ETP_TOOL_E10_PD_HIST

Table FPSADMIN.ETP_TOOL_E10_PD_HIST"

See comments in ETP_APD_TOOL_E10_PD_HIST view.

  • Schema: FPSADMIN

  • Tablespace: FPSDATAHIST

  • Primary key: FACILITY, TOOL, START_PLAN_DAY

  • Foreign keys: ETP_TOOL_E10_PD_H_FK_STDAY: START_PLAN_DAY REFERENCES FPSINPUT.CAL_PLAN_DAYS (START_PLAN_DAY)


Column

Type

Nullable

Comment

FACILITY

VARCHAR2(6)

N

Facility is included in almost every join in the DWH so this represents a definitive split. A route must have all steps on tools in the same facility. A tool must process all lots in the same facility. If your site has multiple buildings where lots run on routes using tools in multiple buildings then everything should be one facility. For example, multiple Fab buildings. But if your site has independent facilities like Fab and Test and Assembly where lot may progress from one to the next but on different routes then these should be different facilities. Since this column is in virtually every table it is critical that the value here is exactly matches what is in the MES if the MES has facility. Use facility_display for the display friendly name displayed in applications. See site_name comment for client/site/facility example. (* from FPSINPUT.GEN_FACILITIES)

TOOL

VARCHAR2(16)

N

Tool is generally just the main tool. The exception is when different entities on the tool run completely independently and it is physically impossible to run wafers of the same lot across multiple entities. In this exception case, we may want to assign the entities to different eqp_types and therefore we should define each entity as a tool. Please note that when we do this there is no indication whatsoever that these different entities are on the same tool. (* from FPSINPUT.EQP_TOOLS)

START_PLAN_DAY

DATE

N

Plan days must be 24 hours in length and the start of the plan day must be the start of one of the shifts. Contrast this to plan day which is independent of shift. (* from FPSINPUT.CAL_PLAN_DAYS)

AMU

NUMBER(9,3)

AOU

NUMBER(9,3)

ATU

NUMBER(9,3)

E10_ENG

NUMBER(10,1)

E10_EQP_DOWN

NUMBER(10,1)

E10_EQP_UP

NUMBER(10,1)

E10_E_OPER

NUMBER(10,1)

E10_E_SDT

NUMBER(10,1)

E10_E_SDT_ENTITIES

NUMBER(10,1)

E10_E_UDT

NUMBER(10,1)

E10_E_UDT_ENTITIES

NUMBER(10,1)

E10_MFG

NUMBER(10,1)

E10_NST

NUMBER(10,1)

E10_OPER

NUMBER(10,1)

E10_PRD

NUMBER(10,1)

E10_SBY

NUMBER(10,1)

E10_SDT

NUMBER(10,1)

E10_SDT_ENTITIES

NUMBER(10,1)

E10_SDT_PM_ENTITIES

NUMBER(10,1)

E10_SDT_QUAL_ENTITIES

NUMBER(10,1)

E10_SDT_WO_WAITS

NUMBER(10,1)

E10_TOTAL

NUMBER(10,1)

E10_TOTAL_ENTITIES

NUMBER(10,1)

E10_UDT

NUMBER(10,1)

E10_UDT_ENTITIES

NUMBER(10,1)

E10_UDT_QUAL_ENTITIES

NUMBER(10,1)

E10_UDT_WO_WAITS

NUMBER(10,1)

E10_UDT_WO_WAITS_ENTITIES

NUMBER(10,1)

END_PLAN_DAY

DATE

It is critical that this field equal the start_plan_day of the next plan day. (* from FPSINPUT.CAL_PLAN_DAYS)

E_AOSDT

NUMBER(9,3)

E_AOU

NUMBER(9,3)

E_AOUDT

NUMBER(9,3)

E_MTBF_P

NUMBER(9,3)

E_MTBF_U

NUMBER(9,3)

E_MTTR

NUMBER(9,3)

E_MUBF

NUMBER(12,3)

IT

NUMBER(9,3)

MFD_P

NUMBER(9,3)

MFD_U

NUMBER(9,3)

MTBF_P

NUMBER(9,3)

MTBF_U

NUMBER(9,3)

MTOL

NUMBER(9,3)

MTTI

NUMBER(9,3)

MTTPM

NUMBER(9,3)

MTTQ

NUMBER(9,3)

MTTR

NUMBER(9,3)

MUBF

NUMBER(12,3)

N_CDT_EPISODES

NUMBER(6,1)

N_CDT_EPISODES_ENTITIES

NUMBER(6,1)

N_E_SDT_EPISODES

NUMBER(6,1)

N_E_SDT_EPISODES_ENTITIES

NUMBER(6,1)

N_E_UDT_EPISODES

NUMBER(6,1)

N_E_UDT_EPISODES_ENTITIES

NUMBER(6,1)

N_E_UDT_P_EPISODES

NUMBER(6,1)

N_ONLY_ALARMS

NUMBER(6,1)

N_ONLY_QUALS

NUMBER(6,1)

N_PM_EPISODES_ENTITIES

NUMBER(6,1)

N_QUALS

NUMBER(6,1)

N_SDT_EPISODES

NUMBER(6,1)

N_SDT_EPISODES_ENTITIES

NUMBER(6,1)

N_SDT_P_EPISODES

NUMBER(6,1)

N_SDT_P_EPISODES_ENTITIES

NUMBER(6,1)

N_UDT_EPISODES

NUMBER(6,1)

N_UDT_EPISODES_ENTITIES

NUMBER(6,1)

N_UDT_P_EPISODES

NUMBER(6,1)

N_UDT_P_EPISODES_ENTITIES

NUMBER(6,1)

PLAN_DAY

VARCHAR2(13)

Name of plan day must be unique and can be in any format as long as it is display friendly since this is what we show everywhere. We prefer that other tables should reference start_plan_day rather than plan_day in case we want to change the naming convention for the plan_day. (* from FPSINPUT.CAL_PLAN_DAYS)

TFR

NUMBER(10,3)

UNITS

NUMBER(10,1)

UOU

NUMBER(9,3)

UTU

NUMBER(9