Table FPSBASE.ECT_FINISHED_LOT_HIST"

A record for each finished lot showing the total cycle time spent in the facility broken down by queue, hold, bank, and other categories. The primary key of this table should be lot+facility but it is actually lot+facility+inst and there are two reasons for this. The first reason is that some sites allow a lot to be shipped and then unshipped and then shipped again. When this happens only the first record will be valid so this will not impact CTR views. The second reason is that some sites reuse the same lot_id values in their MES for new lots. So one particular physical lot can only finish once per facility. However two different physical lots with the same lot_id value can finish at different times. This will impact CTR views but it is extremely rare so we accept that CTR will not work properly if a site does this with production lots.

  • Schema: FPSBASE

  • Tablespace: FPSDATAHIST

  • Primary key: INST, FACILITY, LOT, IS_IN_SAME_FAC_SEQ


Column

Type

Nullable

Comment

INST

DATE

N

Time when the event occurred. (* from FPSINPUT.WIP_EVENT_HIST)

FACILITY

VARCHAR2(6)

N

Facility is included in almost every join in the DWH so this represents a definitive split. A route must have all steps on tools in the same facility. A tool must process all lots in the same facility. If your site has multiple buildings where lots run on routes using tools in multiple buildings then everything should be one facility. For example, multiple Fab buildings. But if your site has independent facilities like Fab and Test and Assembly where lot may progress from one to the next but on different routes then these should be different facilities. Since this column is in virtually every table it is critical that the value here is exactly matches what is in the MES if the MES has facility. Use facility_display for the display friendly name displayed in applications. See site_name comment for client/site/facility example. (* from FPSINPUT.GEN_FACILITIES)

LOT

VARCHAR2(32)

N

A lot is a group of units that process together. Usually lot_id or lot_number in MES. All units in a lot are in the same carrier but there may be multiple lots in a carrier. (* from FPSINPUT.WIP_LOTS_STATIC)

IS_IN_SAME_FAC_SEQ

CHAR(1)

N

COMBINED_LOT_FOR_SAME_FAC_SEQ

VARCHAR2(32)

COMMIT_CT_DAYS

NUMBER(5,1)

Number of days of cycle time committed to the customer for the prd or bank. This commit is published externally. This should be greater than or equal to the target. (* from FPSINPUT.RTG_BANKS)

DIE_BANK_SEC

NUMBER(9)

N

FIFTH_BANK

VARCHAR2(36)

FIFTH_BANK_SEC

NUMBER(9)

FINISHED_INST

DATE

FINISHED_PERIOD

VARCHAR2(7)

N

FIRST_BANK

VARCHAR2(36)

FIRST_BANK_SEC

NUMBER(9)

FIRST_OPER_ENT_INST

DATE

FIRST_OPER_FOR_LOT

VARCHAR2(50)

FIRST_PRD_IF_SAME_FAC_SEQ

VARCHAR2(64)

FIRST_STEP_FOR_LOT

VARCHAR2(256)

N

FIRST_STEP_ON_ROUTE

VARCHAR2(256)

FOURTH_BANK

VARCHAR2(36)

FOURTH_BANK_SEC

NUMBER(9)

INSERTED_TIME

TIMESTAMP(6)

Timestamp field set by trigger storing SYSTIMESTAMP when record was inserted in the table. (* from FPSINPUT.WIP_EVENT_HIST)

IS_NONSTD

CHAR(1)

Our column to indicate non-standard processing at the step. For example, an experiment or a chain that is only active at a particular step or set of steps and then goes back to being normal for the route. If an experiment is severe enough that it affects the final product and has to be planned separately then it will be its own prd or planprd. (* from FPSBASE.WIP_LOT_HIST)

IS_START_FROM_CSLH

CHAR(1)

IS_VALID

CHAR(1)

N

We consider a lot valid for our finished lot calculations when the lot moved through the first step and the last step on the main route for its product. There are some variations such as the lot moved through the first step on an older version of the route or finished with an event specifically marked as a ship event or the route did not have any steps.

LAST_OPER_FOR_LOT

VARCHAR2(50)

LAST_OPER_MOVE_INST

DATE

LAST_PRD_IF_SAME_FAC_SEQ

VARCHAR2(64)

LAST_STEP_FOR_LOT

VARCHAR2(256)

N

LAST_STEP_ON_ROUTE

VARCHAR2(256)

LOT_GROUP

VARCHAR2(8)

N

Lot_group is a grouping of lot_family and is the highest grouping in the lot type hierarchy. There should be only a few values for lot_group, i.e. Prod, Dev, TW. We group WIP and moves by lot_group on the dashboard and we group cycle time calculations by lot_group so this is an important field. (* from FPSINPUT.WIP_LOT_GROUPS)

LOT_TYPE

VARCHAR2(24)

N

Lot_type is the base of the hierarchy that determines lot_family then lot_group. Ideally lot_type will come straight from the MES with little modification. (* from FPSINPUT.WIP_LOT_TYPES)

MAIN_ROUTE_OF_PRD

VARCHAR2(256)

N

MERGE_TO_LOT_ON_FINISH

VARCHAR2(512)

MIN_BANK_ENT_INST

DATE

MIN_OVERALL_ENT_INST

DATE

N

MIN_STEP_ENT_INST

DATE

NEXT_FACILITY

VARCHAR2(6)

Event moved the lot to this new facility (* from FPSINPUT.WIP_EVENT_HIST)

NEXT_PRD

VARCHAR2(64)

Event moved the lot to this new prd (* from FPSINPUT.WIP_EVENT_HIST)

NUM_PHOTO_LAYERS

NUMBER(3)

NUM_STEPS_COMP

NUMBER(4)

ORDER_ID

VARCHAR2(64)

The customer order to which this lot belongs. (* from FPSINPUT.WIP_LOTS_STATIC)

OVERLAPPING_BANK_SEC

NUMBER(9)

PLANPRD

VARCHAR2(64)

N

Planning product used for all planning purposes. All lots with the same planprd are interchangeable to ship to the customer regardless of their prd, route, technology, wafer size, etc. For detailed information on prd vs. planprd see table comments in RTG_PLANPRDS. (* from FPSINPUT.RTG_PLANPRDS)

PLAN_PRIORITY

VARCHAR2(7)

N

Permanent priority of the lot set in the MES generally by planning. (* from FPSINPUT.WIP_EVENT_HIST)

PRD

VARCHAR2(64)

N

Prd determines the route which is used to process the lot in the facility and what tools, recipes, durables, etc. can be used at each step. Prd also determines the next facility for the lot when it finishes its route. For detailed information on prd vs. planprd see table comments in RTG_PLANPRDS. (* from FPSINPUT.RTG_PRDS)

QTY

NUMBER(7)

N

Quantity of units in the lot according the qty_unit defined for the facility. It is required for all lots in each facility to have their qty defined in the same units therefore the change in the unit is critical to defining the facility. For example, a pretest facility might have a sort step in the middle where we learn the qty of die. Prior to this step we know only the wafer qty but after this step we know both wafer and die. Since wafer is the only qty we know throughput the flow then wafer must be defined as the qty unit for this facility. Die can then be populated as sec_qty when it is known. Similarly the wafer saw facility might have a step in the middle where we cut the wafers into die. After this step we no longer know the number of wafers which means that die must be the qty unit for this facility and wafers can be the sec_qty prior to the saw step. Please note that a lot with qty of 0 is allowed but only if the sec_qty is greater than 0. This is unusual but one case is where we know the wafers will be scrapped but cannot be scrapped quite yet. (* from FPSINPUT.WIP_EVENT_HIST)

QTY_AFTER

NUMBER(7)

N

ROUTE_AT_FIRST_STEP

VARCHAR2(256)

ROUTE_AT_LAST_STEP

VARCHAR2(256)

ROUTE_AT_SHIP_EVENT

VARCHAR2(256)

ROUTE_FAMILY

VARCHAR2(36)

Route_family indicates that all routes within the family have similar or even identical steps and have the same segments. At facilities where various prds share the same route it is likely that the route will be the route_family. This is sometimes referred to as the main process flow. It is used on Segment Summary and Line Viewer to group similar routes. (* from FPSINPUT.RTG_ROUTE_FAMILIES)

ROUTE_GROUP

VARCHAR2(36)

Route_group is the parent of route_family. Route_group is used on the Dashboard and other applications as a large grouping for filtering. At many sites this is referred to as technology. (* from FPSINPUT.RTG_ROUTE_GROUPS)

SECOND_BANK

VARCHAR2(36)

SECOND_BANK_SEC

NUMBER(9)

SHIP_INST

DATE

SPLIT_FROM_LOT

VARCHAR2(32)

SPLIT_FROM_LOT2

VARCHAR2(32)

SPLIT_FROM_LOT3

VARCHAR2(32)

SPLIT_FROM_LOT4

VARCHAR2(32)

SPLIT_INST

DATE

SPLIT_INST2

DATE

SPLIT_INST3

DATE

SPLIT_INST4

DATE

START_INST

DATE

Time when the lot started. (* from FPSINPUT.WIP_STARTS)

START_PLAN_DAY

DATE

Plan days must be 24 hours in length and the start of the plan day must be the start of one of the shifts. Contrast this to plan day which is independent of shift. (* from FPSINPUT.CAL_PLAN_DAYS)

START_SHIFT

DATE

Shifts can be of any length and it is important that all queries get the shift length based on start_shift and end_shift rather than assuming a set number of hours. (* from FPSINPUT.CAL_SHIFTS)

STEP_ABORT_SEC

NUMBER(9)

N

STEP_BLOCK_SEC

NUMBER(9)

N

STEP_DISP_SEC

NUMBER(9)

N

STEP_DOWN_SEC

NUMBER(9)

N

STEP_ENDED_SEC

NUMBER(9)

N

STEP_HOLD_SEC

NUMBER(9)

N

STEP_LONGH_SEC

NUMBER(9)

N

STEP_OFFRT_SEC

NUMBER(9)

N

STEP_PROC_SEC

NUMBER(9)

N

STEP_RESRV_SEC

NUMBER(9)

N

STEP_SHUTD_SEC

NUMBER(9)

N

STEP_STG_SEC

NUMBER(9)

N

STEP_TCT_SEC

NUMBER(9)

N

STEP_TOTAL_SEC

NUMBER(9)

N

STEP_WAIT1_SEC

NUMBER(9)

N

STEP_WAIT2_SEC

NUMBER(9)

N

STEP_WAIT3_SEC

NUMBER(9)

N

TARGET_CT_DAYS

NUMBER(5,1)

Number of days of cycle time targeted for the prd or bank. This target is only published internally which often means it is not even published to corporate planning. This should be less than or equal to the commit. (* from FPSINPUT.RTG_BANKS)

THIRD_BANK

VARCHAR2(36)

THIRD_BANK_SEC

NUMBER(9)

TOTAL_BANK_SEC

NUMBER(9)

N

USE_IN_CTR

CHAR(1)

N

WAFER_SIZE

VARCHAR2(8)

If the facility only has one wafer size then this column should be null in both RTG_PRDS and EQP_TYPES. If the facility has more than one wafer size then a value of null in EQP_TYPES means that those tools can run all wafer sizes. See column IS_ANY_WAFER_SIZE for details. (* from FPSINPUT.GEN_WAFER_SIZES)