Data Dictionary
>
FPSADMIN Tables
> FPSADMIN.SCH_W_SCHED_SUMMARY
Table FPSADMIN.SCH_W_SCHED_SUMMARY"
This table is to used to store the summary for each scheduler run.
-
Schema: FPSADMIN
-
Tablespace: FPSDATA
-
Primary key: RUN_ID, FACILITY, SCHED_GROUP
|
Column |
Type |
Nullable |
Comment |
|---|---|---|---|
|
RUN_ID |
VARCHAR2(50) |
N |
the run id from the last successful scheduler (* from FPSAPP.SCH_W_SCHED_GROUP_STATUS) |
|
FACILITY |
VARCHAR2(6) |
N |
Facility is included in almost every join in the DWH so this represents a definitive split. A route must have all steps on tools in the same facility. A tool must process all lots in the same facility. If your site has multiple buildings where lots run on routes using tools in multiple buildings then everything should be one facility. For example, multiple Fab buildings. But if your site has independent facilities like Fab and Test and Assembly where lot may progress from one to the next but on different routes then these should be different facilities. Since this column is in virtually every table it is critical that the value here is exactly matches what is in the MES if the MES has facility. Use facility_display for the display friendly name displayed in applications. See site_name comment for client/site/facility example. (* from FPSINPUT.GEN_FACILITIES) |
|
SCHED_GROUP |
VARCHAR2(36) |
N |
This is the grouping of tools and processes which the FPS Scheduler schedules together. Since this is a parent of tool via tool->process_group and a parent of process via process->process_group, by definition each tool and each process can only be in one sched group. We need all related tools and processes to be in the same sched group for efficient scheduling. One example is sinks and furnaces because of queue times and batching. Another example is for smaller facilities like Assembly or Test where we might schedule the entire facility together. (* from FPSINPUT.RTG_PROCESS_GROUPS) |
|
CONFIG_ID |
VARCHAR2(50) |
This is used to tell which configuration the current sched-group is using (* from FPSINPUT.RTG_SCHED_GROUPS) |
|
|
CREATE_INST |
DATE |
||
|
EST_START_INST |
DATE |
Best guess at when the mnt event started. If actual_start_inst is provided it will be that value otherwise it will be the inst - est_mnt_duration_sec (* from FPSBASE.EQP_MNT_HIST) |
|
|
HOURS_TO_SCHEDULE |
NUMBER |
This column is used to determine how many hours to look ahead and schedule the lots that might come into this area/SCHED-GROUP even it is still several steps away. (* from FPSINPUT.RTG_SCHED_GROUPS) |
|
|
NUM_LOT_NOT_SCHEDULED |
NUMBER |
||
|
NUM_LOT_SCHEDULED |
NUMBER |
||
|
PCT_LOTSTEPS_PLACED |
NUMBER |
||
|
RUN_BY |
VARCHAR2(256) |
||
|
RUN_COMMENTS |
VARCHAR2(1024) |
||
|
RUN_END_INST |
DATE |
||
|
RUN_LOCATION |
VARCHAR2(500) |
||
|
RUN_METHOD |
VARCHAR2(24) |
||
|
RUN_START_INST |
DATE |
||
|
RUN_STATE |
VARCHAR2(500) |
||
|
SAVE_START_INST |
DATE |
||
|
SCHED_VERSION |
VARCHAR2(50) |
||
|
SEC_CALCULATE |
NUMBER |
||
|
SEC_LOAD_CONFIG |
NUMBER |
||
|
SEC_LOAD_DATA |
NUMBER |
||
|
SEC_SAVE |
NUMBER |
||
|
STEPS_TO_SCHEDULE |
NUMBER |
This column is used to determine how many steps to look ahead and schedule the lots that might come into this area/SCHED-GROUP even it is still several hours away. Between HOURS_TO_SCHEDULE and STEPS_TO_SCHEDULE, the Scheduler will try to schedule all the lots either will arrive within X hours OR within Y steps away. (* from FPSINPUT.RTG_SCHED_GROUPS) |
|
|
UPDATE_INST |
DATE |