Data Dictionary
>
FPSAPP Tables
> FPSAPP.CM_W_ROUTE_STEP_EQPS_SMP
Table FPSAPP.CM_W_ROUTE_STEP_EQPS_SMP"
Table contains override for sample percentage in the Capacity Model.. This table is populated by upload from the CM website.
-
Schema: FPSAPP
-
Tablespace: FPSDATA
-
Primary key: FACILITY, EQP_TYPE, ROUTE, STEP, WORKWEEK, SCENARIO
-
Foreign keys: CM_W_ROUTE_STEP_EQPS_SM_FK_FAC: FACILITY REFERENCES FPSINPUT.GEN_FACILITIES (FACILITY)
|
Column |
Type |
Nullable |
Comment |
|---|---|---|---|
|
FACILITY |
VARCHAR2(6) |
N |
Facility is included in almost every join in the DWH so this represents a definitive split. A route must have all steps on tools in the same facility. A tool must process all lots in the same facility. If your site has multiple buildings where lots run on routes using tools in multiple buildings then everything should be one facility. For example, multiple Fab buildings. But if your site has independent facilities like Fab and Test and Assembly where lot may progress from one to the next but on different routes then these should be different facilities. Since this column is in virtually every table it is critical that the value here is exactly matches what is in the MES if the MES has facility. Use facility_display for the display friendly name displayed in applications. See site_name comment for client/site/facility example. (* from FPSINPUT.GEN_FACILITIES) |
|
EQP_TYPE |
VARCHAR2(50) |
N |
Each tool is assigned an EQP_TYPE and all tools in the same type are identical meaning that they should run at the same throughput when running the same process with the same chamber type count. We also expect similar availability since these tools are identical. However tools in the same EQP_TYPE may have different chamber configurations and may run different groups of processes. (* from FPSINPUT.EQP_TYPES) |
|
ROUTE |
VARCHAR2(256) |
N |
Route that has threading requirements (* from FPSINPUT.RTG_STEP_THREADING) |
|
STEP |
VARCHAR2(256) |
N |
A single processing step within a route representing a single tool visit. Step is often a very complex string and should rarely be displayed. Instead we should use process_display. (* from FPSINPUT.RTG_ROUTE_STEPS) |
|
WORKWEEK |
VARCHAR2(7) |
N |
|
|
SCENARIO |
VARCHAR2(16) |
N |
|
|
EST_SMP_PCT |
NUMBER(5 |
Smp_pct tells you what percentage of the lots complete on a tool. Some sites skip steps by jumping over them so we see the lot move from step 3 to step 5 and we only know that it jumped step 4 because step 4 is on the route between 3 and 5. Other sites skip steps by moving lots into them and then moving them out a second later so we see a move from 3 to 4 at 11:11:11 and a move from 4 to 5 at 11:11:12. We do not care how it is done but just that the lot did not process at step 4 -- and to be more specific that no tool capacity is required to process this lot at step 4 and no cycle time is accumulated at step 4. (* from FPSBASE.WIP_GOAL_LOT_SHIFT) |