FPSINPUT.WIP_DEMAND_HIST

Data Dictionary

>

FPSINPUT Tables

> FPSINPUT.WIP_DEMAND_HIST

Table FPSINPUT.WIP_DEMAND_HIST"

See comments in WIP_APD_DEMAND_HIST view.

  • Schema: FPSINPUT

  • Tablespace: FPSDATAHIST

  • Primary key: INST, FACILITY, PLANPRD, DEMAND_INST


Column

Type

Nullable

Comment

INST

DATE

N

Time when the event occurred. (* from FPSINPUT.WIP_EVENT_HIST)

FACILITY

VARCHAR2(6)

N

Facility is included in almost every join in the DWH so this represents a definitive split. A route must have all steps on tools in the same facility. A tool must process all lots in the same facility. If your site has multiple buildings where lots run on routes using tools in multiple buildings then everything should be one facility. For example, multiple Fab buildings. But if your site has independent facilities like Fab and Test and Assembly where lot may progress from one to the next but on different routes then these should be different facilities. Since this column is in virtually every table it is critical that the value here is exactly matches what is in the MES if the MES has facility. Use facility_display for the display friendly name displayed in applications. See site_name comment for client/site/facility example. (* from FPSINPUT.GEN_FACILITIES)

PLANPRD

VARCHAR2(64)

N

Planning product used for all planning purposes. All lots with the same planprd are interchangeable to ship to the customer regardless of their prd, route, technology, wafer size, etc. For detailed information on prd vs. planprd see table comments in RTG_PLANPRDS. (* from FPSINPUT.RTG_PLANPRDS)

DEMAND_INST

DATE

N

Start of period when this qty of this planprd needs to finish. We automatically spread demand across each plan week in WIP_DEMAND_BY_WEEK which feeds WIP_FLUSH therefore this column can be the start of any time period less than or equal to plan week. It could be the demand for each shift or for each day or for each plan week but if the site has no preference then the easiest way to set this up is to write one row per plan week and let us spread across that week. It is important to note that we always spread across the plan week with our custom logic so even if this table is by day we might adjust it to another day within the same plan week. (* from FPSINPUT.WIP_DEMAND)