Data Dictionary
>
FPSINPUT Tables
> FPSINPUT.DASH_B_H_SHIFT_SUMMARY
Table FPSINPUT.DASH_B_H_SHIFT_SUMMARY"
See comments in DASH_APD_B_H_SHIFT_SUMMARY view.
-
Schema: FPSINPUT
-
Tablespace: FPSDATAHIST
-
Primary key: FACILITY, ROUTE, STEP, BANK, PRD, PLANPRD, LOT_TYPE, PLAN_PRIORITY, IS_NONSTD, START_SHIFT
-
Foreign keys: DASH_B_H_SHIFT_SUMM_FK_STSH: START_SHIFT REFERENCES FPSINPUT.CAL_SHIFTS (START_SHIFT)
|
Column |
Type |
Nullable |
Comment |
|---|---|---|---|
|
FACILITY |
VARCHAR2(6) |
N |
Facility is included in almost every join in the DWH so this represents a definitive split. A route must have all steps on tools in the same facility. A tool must process all lots in the same facility. If your site has multiple buildings where lots run on routes using tools in multiple buildings then everything should be one facility. For example, multiple Fab buildings. But if your site has independent facilities like Fab and Test and Assembly where lot may progress from one to the next but on different routes then these should be different facilities. Since this column is in virtually every table it is critical that the value here is exactly matches what is in the MES if the MES has facility. Use facility_display for the display friendly name displayed in applications. See site_name comment for client/site/facility example. (* from FPSINPUT.GEN_FACILITIES) |
|
ROUTE |
VARCHAR2(256) |
N |
Route that has threading requirements (* from FPSINPUT.RTG_STEP_THREADING) |
|
STEP |
VARCHAR2(256) |
N |
A single processing step within a route representing a single tool visit. Step is often a very complex string and should rarely be displayed. Instead we should use process_display. (* from FPSINPUT.RTG_ROUTE_STEPS) |
|
BANK |
VARCHAR2(36) |
N |
Lots which are not on a route are considered in a bank and the bank name indicates why the lot is off route. Bank must be NA for lots which are on a route. Our standard filter for active lots is bank = NA. (* from FPSINPUT.RTG_BANKS) |
|
PRD |
VARCHAR2(64) |
N |
Prd determines the route which is used to process the lot in the facility and what tools, recipes, durables, etc. can be used at each step. Prd also determines the next facility for the lot when it finishes its route. For detailed information on prd vs. planprd see table comments in RTG_PLANPRDS. (* from FPSINPUT.RTG_PRDS) |
|
PLANPRD |
VARCHAR2(64) |
N |
Planning product used for all planning purposes. All lots with the same planprd are interchangeable to ship to the customer regardless of their prd, route, technology, wafer size, etc. For detailed information on prd vs. planprd see table comments in RTG_PLANPRDS. (* from FPSINPUT.RTG_PLANPRDS) |
|
LOT_TYPE |
VARCHAR2(24) |
N |
Lot_type is the base of the hierarchy that determines lot_family then lot_group. Ideally lot_type will come straight from the MES with little modification. (* from FPSINPUT.WIP_LOT_TYPES) |
|
PLAN_PRIORITY |
VARCHAR2(7) |
N |
Permanent priority of the lot set in the MES generally by planning. (* from FPSINPUT.WIP_EVENT_HIST) |
|
IS_NONSTD |
CHAR(1) |
N |
Our column to indicate non-standard processing at the step. For example, an experiment or a chain that is only active at a particular step or set of steps and then goes back to being normal for the route. If an experiment is severe enough that it affects the final product and has to be planned separately then it will be its own prd or planprd. (* from FPSBASE.WIP_LOT_HIST) |
|
START_SHIFT |
DATE |
N |
Shifts can be of any length and it is important that all queries get the shift length based on start_shift and end_shift rather than assuming a set number of hours. (* from FPSINPUT.CAL_SHIFTS) |
|
ACTIVE_CODE |
VARCHAR2(1) |
||
|
COMPLETES_PCT |
NUMBER(5,2) |
||
|
CUSTOMER |
VARCHAR2(64) |
Customer who will accept shipment of the lot. Currently this only used for grouping and filtering but in the future we might want to allow a customer to view a Dashboard only including their products. (* from FPSINPUT.GEN_CUSTOMERS) |
|
|
END_SHIFT |
DATE |
End of shift must be equal to the start of the next shift. Please note that the exact time which is both of the end of the previous shift and the start of the next shift is included in the next shift. In other words, start_shift <= inst < end_shift. (* from FPSINPUT.CAL_SHIFTS) |
|
|
EST_GOAL_COMPLETES |
NUMBER(12,4) |
||
|
EST_GOAL_MOVES |
NUMBER(12,4) |
||
|
EST_SMP_PCT |
NUMBER(5,2) |
Smp_pct tells you what percentage of the lots complete on a tool. Some sites skip steps by jumping over them so we see the lot move from step 3 to step 5 and we only know that it jumped step 4 because step 4 is on the route between 3 and 5. Other sites skip steps by moving lots into them and then moving them out a second later so we see a move from 3 to 4 at 11:11:11 and a move from 4 to 5 at 11:11:12. We do not care how it is done but just that the lot did not process at step 4 -- and to be more specific that no tool capacity is required to process this lot at step 4 and no cycle time is accumulated at step 4. (* from FPSBASE.WIP_GOAL_LOT_SHIFT) |
|
|
GOAL_COMPLETES |
NUMBER(12,4) |
Completes goal for the current shift. Typically we calculate either completes or moves goal depending on the site logic and then either multiply moves by est_smp_pct to get completes or divide completes by est_smp_pct to get moves. (* from FPSINPUT.WIP_GOALS_PER_SHIFT) |
|
|
GOAL_MOVES |
NUMBER(12,4) |
Moves goal for the current shift means how many units we need to move through this step to progress towards our demand or due date. This could be either a complete or a skip. Typically we calculate either completes or moves goal depending on the site logic and then either multiply moves by est_smp_pct to get completes or divide completes by est_smp_pct to get moves. (* from FPSINPUT.WIP_GOALS_PER_SHIFT) |
|
|
GOAL_OPER_MOVES |
NUMBER(12,4) |
Oper moves goal for the current shift. This should be recorded at only one step of the operation at it can be at any step not necessarily the last one. Since we do not get an oper move if we skip the entire operation, this is typically the maximum goal completes for any step in the operation. Some sites might calculate goal oper moves independently and potentially even get goal moves and completes from the goal oper moves. (* from FPSINPUT.WIP_GOALS_PER_SHIFT) |
|
|
GOAL_WIP |
NUMBER(12,4) |
WIP goal for each shift. If you are using the GP logic in FPSAPP to get WIP goals for line balancing then you might want to pull those goals into this table to show on Dashboard. If not, this can be calculated by dividing the goal moves per day (from this logic) by the commit cycle time in days for the step (from CTM_SUMMARY_PLUS). (* from FPSINPUT.WIP_GOALS_PER_SHIFT) |
|
|
IS_IGNORE_MOVES |
CHAR(1) |
This flag is in both RTG_OPERATION_FAMILIES and RTG_PROCESSES. If the value is Y for the operation family then we do not count moves from those operations as oper moves. If the value is Y for either the operation family or the process then we do not count moves from the route-step as completes even if our normal logic suggests that it should be a complete. This logic can cause confusion so here are a few important notes. 1) Dashboard does not read the is_ignore_moves flag therefore we must set move_type to DSKIP rather than COMP and we must set is_oper_move to N in order to ignore the move. 2) This flag is often used for staging steps but it is independent of the is_staging_step flag so if you want to ignore staging steps then you need to set these flags appropriately. 3) The flag in RTG_PROCESSES does not directly affect the oper moves but it does affect it indirectly if the is_comp_rqd_for_oper_move is set to Y. In that case, if the only move during the operation is for a process which is ignored then we do not have a complete during the operation and therefore will not count the move from the operation as an oper move since a complete is required. (* from FPSINPUT.RTG_OPERATION_FAMILIES) |
|
|
IS_IGNORE_WIP |
CHAR(1) |
This flag is in both RTG_OPERATION_FAMILIES and RTG_PROCESSES. If the value is Y for either the operation family or the process then we do not count WIP at the route-step towards the total for the facility. Typically this is set for staging operations. (* from FPSINPUT.RTG_OPERATION_FAMILIES) |
|
|
IS_TW |
CHAR(1) |
Our standard filter to exclude test wafers is is_tw = N but what we really mean with this filter is to exclude any lots that do not add value for the facility. Lots which add value including sellable, development, and engineering and these lot groups should have is_tw set to N. Lots which do not add value are commonly grouped together and named "test wafers" which is why this flag is named is_tw. These include true test wafers like monitors and quals and dummies but also could include virtual lots used for training or testing, bare wafers, or really anything else including in the MES as a lot which does not add value. All of these lot groups should have is_tw set to Y. You could argue that the is_tw field might be more accurately named is_value or is_valuable or is_prod_eng_dev but is_tw is generally clear to most people. Plus it has the advantage that it is short which is nice given how frequently we use the is_tw = N filter. (* from FPSINPUT.WIP_LOT_GROUPS) |
|
|
LINE_SECTION |
VARCHAR2(32) |
Large grouping of the line, e.g. FEOL, BEOL, Cu, etc. There should be only a handful of values for the entire facility - or if the facility only has one section then we can leave this column blank. (* from FPSINPUT.RTG_LINE_SECTIONS) |
|
|
LOT_FAMILY |
VARCHAR2(24) |
Lot_family is a grouping of lot_type which is mainly use for goal planning. We set goals by family and are allowed to switch goals for different lots of different types within the family. We also report goal performance by family. (* from FPSINPUT.WIP_LOT_FAMILIES) |
|
|
LOT_GOAL_COMPLETES |
NUMBER(12,4) |
||
|
LOT_GOAL_MOVES |
NUMBER(8) |
||
|
LOT_GROUP |
VARCHAR2(8) |
Lot_group is a grouping of lot_family and is the highest grouping in the lot type hierarchy. There should be only a few values for lot_group, i.e. Prod, Dev, TW. We group WIP and moves by lot_group on the dashboard and we group cycle time calculations by lot_group so this is an important field. (* from FPSINPUT.WIP_LOT_GROUPS) |
|
|
MAIN_ROUTE_FAMILY |
VARCHAR2(36) |
Route family of the main route for the prd of the lot. (* from FPSINPUT.WIP_OVR_OPER_MOVES_HIST) |
|
|
MAIN_ROUTE_GROUP |
VARCHAR2(36) |
Route group of main route. Often referred to as technology. (* from FPSBASE.WIP_FLUSH) |
|
|
MOVES_PCT |
NUMBER(5,2) |
||
|
NUM_CARR_ENDWIP_HOLD |
NUMBER(5) |
N |
|
|
NUM_CARR_ENDWIP_NOTHOLD |
NUMBER(5) |
N |
|
|
NUM_LOTS_COMP |
NUMBER(5) |
||
|
NUM_LOTS_DSKIP |
NUMBER(5) |
||
|
NUM_LOTS_ENDWIP |
NUMBER |
||
|
NUM_LOTS_ENDWIP_HOLD |
NUMBER(5) |
N |
|
|
NUM_LOTS_ISKIP |
NUMBER(5) |
||
|
NUM_LOTS_OPER_MOVES |
NUMBER(5) |
||
|
NUM_LOTS_REPEAT |
NUMBER(5) |
||
|
OPERATION |
VARCHAR2(50) |
Operation is usually the primary level of routing in the MES and the level where the facility typically reports moves. FPS only allows one tool per step so our step is a lower level of routing than operation although both may be the same if the MES only allows one tool per operation. Note that because operation can include multiple steps and therefore multiple process families that we cannot have any association to equipment by operation. (* from FPSINPUT.RTG_OPERATIONS) |
|
|
OPERATION_FAMILY |
VARCHAR2(36) |
Grouping of route-step that is completely dependent on routing information from MES. The primary use of this field is for filtering on Operations Dashboard. Unfortunately for our database structure and naming convention, this field no longer has any link to operation. This is because operation is used primarily for Oper Moves and it is normal for steps in an operation to belong to multiple MES routing groups. For example, a sink step and a furnace step and a measurement step are in the same operation but each step belongs to the appropriate sink/furnace/measurement MES routing groups which we store in operation family. Since Dashboard already uses both operation and operation_family extensively and independently, we decided not to rename either column but simply remove the link. Please note that operation family is similar to process family and in fact they are often the same. The key differences are that operation family has nothing to do with equipment and that comes straight from ETL with no complex logic. Process family is the link between routing and equipment for the Operations Dashboard and therefore has complex logic. (* from FPSINPUT.RTG_OPERATION_FAMILIES) |
|
|
OPER_MOVES_PCT |
NUMBER(5,2) |
||
|
OVR_OPERATION |
VARCHAR2(50) |
||
|
OVR_QTY_OPER_COMPS |
NUMBER(9) |
||
|
OVR_QTY_OPER_MOVES |
NUMBER(9) |
||
|
PROCESS |
VARCHAR2(50) |
Process defines what occurs at a step. Different steps can share the same process if they are identical. Process should normally determine allowed tools and recipe although it can be overridden by step, route, prd, lot, and experiment for exceptions. Each process is dynamically assigned to one or more eqp_type-process_family combinations with use_pct. One process_family is determined to be primary. If grouping is done correctly, a process should only be one eqp_group with no crossover. (* from FPSINPUT.RTG_PROCESSES) |
|
|
PROCESS_CLASS |
VARCHAR2(12) |
Top-level grouping of process groups with same general purpose (i.e. Process or Metrology or Nonwafer). Allowed values are defined by FPS and are listed in FPSADMIN.RTG_PROCESS_CLASSES. This field can also be defined in EQP_TOOLS using the ovr_process_class field if we do not know it for the process group. (* from FPSINPUT.RTG_PROCESS_GROUPS) |
|
|
PROCESS_FAMILY |
VARCHAR2(50) |
See https://help.inficonims.com/display/DW/Guide+to+Process+Families. (* from FPSINPUT.RTG_PROCESS_FAMILIES) |
|
|
PROCESS_GROUP |
VARCHAR2(36) |
Process group is the critical field where tools and processes come together for the purposes of Scheduler. Process group is in both EQP_TOOLS for the tools and in RTG_PROCESSES for processes. Ideally all tools that run the same set of processes with no crossover including back-up and emergency tools would be in the same process group but it is important to note that this is not technically required for Scheduler as long as all process groups are in the same sched group. (* from FPSINPUT.RTG_PROCESS_GROUPS) |
|
|
PROCESS_MODULE |
VARCHAR2(12) |
WIP_MODULE is used to credit moves and set goals. See comments on the module column in GEN_MODULES for info on this column and how it relates to eqp_module and mnt_module. (* from FPSBASE.RTG_ROUTE_STEPS_PLUS) |
|
|
PROCESS_SUBFAMILY |
VARCHAR2(100) |
Route step family is used for the Dashboard to separate processes in a process family based on shared but limited assignments. It is also the base for GP subfamily. (* from FPSBASE.RTG_ROUTE_STEPS_PLUS) |
|
|
QTY_COMP |
NUMBER(9) |
N |
|
|
QTY_COMP_AUTO |
NUMBER(9) |
N |
|
|
QTY_COMP_REWORK |
NUMBER(9) |
N |
|
|
QTY_DSKIP |
NUMBER(9) |
N |
|
|
QTY_ENDWIP |
NUMBER |
||
|
QTY_ENDWIP_BLOCK |
NUMBER(9) |
N |
|
|
QTY_ENDWIP_DISP |
NUMBER(9) |
N |
|
|
QTY_ENDWIP_ENDED |
NUMBER(9) |
N |
|
|
QTY_ENDWIP_HOLD |
NUMBER(9) |
N |
|
|
QTY_ENDWIP_PROC |
NUMBER(9) |
N |
|
|
QTY_ENDWIP_WAIT |
NUMBER(9) |
N |
|
|
QTY_ISKIP |
NUMBER(9) |
N |
|
|
QTY_MVIN |
NUMBER(9) |
||
|
QTY_OPER_COMPS |
NUMBER(9) |
||
|
QTY_OPER_MOVES |
NUMBER(9) |
N |
|
|
QTY_OPER_MVIN |
NUMBER(9) |
||
|
QTY_REPEAT |
NUMBER(9) |
N |
|
|
QTY_SHIPPED |
NUMBER(9) |
||
|
ROUTE_SEGMENT |
VARCHAR2(36) |
Route_segment allows for clear hierarchical segment organization for Segment Summary and Line Viewer on Dashboard. This is often referred to as stage and typically will come from the MES (as opposed to facility_segment which we will typically have to define for our purposes). We recommend that all routes in the same route family have the same route segments in the same order so that the Line Viewer by route family will be consistent but if this is not the case then we approximate the order as best we can. (* from FPSINPUT.RTG_ROUTE_STEPS) |
|
|
SHIFT |
VARCHAR2(13) |
Name of shift must be unique and can be in any format as long as it is display friendly since this is what we show everywhere. We prefer that other tables should reference start_shift rather than shift in case we want to change the naming convention for the shift. (* from FPSINPUT.CAL_SHIFTS) |
|
|
TOTAL_HOLD_SEC |
NUMBER(38) |
N |
|
|
TOTAL_STEP_SEC |
NUMBER(38) |
N |
Total number of unit-seconds accumulated by lots on hold at this step during the period including lots which moved out during the period and lots which remain at the end of the period. For example, if a 25 wafer lot is on hold at the step for 2 hours then it accumulates 25 wafers * 7200 seconds = 180000 wafer-seconds of hold time. (* from FPSBASE.WIP_END_SHIFT_HIST) |