Table FPSINPUT.RTG_ROUTE_STEP_EQPTYPE_OVR"

Table allows you to override the values used in calculating the line balance score/tool utilization numbers

  • Schema: FPSINPUT

  • Tablespace: FPSDATA

  • Primary key: FACILITY, ROUTE, STEP, EQP_TYPE

  • Foreign keys: RTG_ROUTE_STEP_EQT_OVR_FK_TYPE: FACILITY, EQP_TYPE REFERENCES FPSINPUT.EQP_TYPES (FACILITY, EQP_TYPE)


Column

Type

Nullable

Comment

FACILITY

VARCHAR2(6)

N

Facility is included in almost every join in the DWH so this represents a definitive split. A route must have all steps on tools in the same facility. A tool must process all lots in the same facility. If your site has multiple buildings where lots run on routes using tools in multiple buildings then everything should be one facility. For example, multiple Fab buildings. But if your site has independent facilities like Fab and Test and Assembly where lot may progress from one to the next but on different routes then these should be different facilities. Since this column is in virtually every table it is critical that the value here is exactly matches what is in the MES if the MES has facility. Use facility_display for the display friendly name displayed in applications. See site_name comment for client/site/facility example. (* from FPSINPUT.GEN_FACILITIES)

ROUTE

VARCHAR2(256)

N

Route that has threading requirements (* from FPSINPUT.RTG_STEP_THREADING)

STEP

VARCHAR2(256)

N

A single processing step within a route representing a single tool visit. Step is often a very complex string and should rarely be displayed. Instead we should use process_display. (* from FPSINPUT.RTG_ROUTE_STEPS)

EQP_TYPE

VARCHAR2(50)

N

Each tool is assigned an EQP_TYPE and all tools in the same type are identical meaning that they should run at the same throughput when running the same process with the same chamber type count. We also expect similar availability since these tools are identical. However tools in the same EQP_TYPE may have different chamber configurations and may run different groups of processes. (* from FPSINPUT.EQP_TYPES)

EST_REWORK_PCT

NUMBER(5,3)

Estimated percentage of lots completing this step which will go to rework. This is used for capacity modeling. (* from FPSINPUT.RTG_ROUTE_STEPS)

EST_SMP_PCT

NUMBER(5,2)

Smp_pct tells you what percentage of the lots complete on a tool. Some sites skip steps by jumping over them so we see the lot move from step 3 to step 5 and we only know that it jumped step 4 because step 4 is on the route between 3 and 5. Other sites skip steps by moving lots into them and then moving them out a second later so we see a move from 3 to 4 at 11:11:11 and a move from 4 to 5 at 11:11:12. We do not care how it is done but just that the lot did not process at step 4 -- and to be more specific that no tool capacity is required to process this lot at step 4 and no cycle time is accumulated at step 4. (* from FPSBASE.WIP_GOAL_LOT_SHIFT)

EST_USE_PCT

NUMBER(5,2)

Estimated use percentage is the percentage of units of this route-step that we expect to run on this eqp_type. Normally we use historical data to calculate this for the Capacity Model but entering a value in the OVR table manually overrides that historical number.

LINE_YIELD_PCT_TO_EOL

NUMBER(6,3)

Line yield percentage to end of line is the percentage of units expected to successfully complete the remaining steps on the route. Normally we multiply the line yield of all remaining steps for the Capacity Model but entering a value in this OVR table manually overrides that calculated number.

MPU

NUMBER(8