Data Dictionary
>
FPSBASE Views
> FPSBASE.WIP_WAFER_HIST_LOOP
View FPSBASE.WIP_REF_STEP_FUT_DURABLE_ASGN
This query for durables was originally in WIP_STEP_FUT_ASSIGNMENTS but we found it to be slightly too slow for queries filtered by lot because lot is an optional column in RDA. Since it using RTAL+RTALP with RTG_DURABLE_ASSIGNMENTS, it is acceptable to be refreshed frequently into a table rather than queried each time in WSFA. This is heavily tested for speed which is why it uses the base tables rather than WIP_STEP_FUT_ASGN_UNIONS view. We only include the lot-based assignments tables here which is appropriate because any site where we have durable logic we will have lot assignments for those tools. We do not include is_in_prty_gantt but this does not make a big delta to the speed of DASH_P_GANTT_PRIORITY_LOTS refresh.
|
Column |
Comment |
|---|---|
|
LOT |
A lot is a group of units that process together. Usually lot_id or lot_number in MES. All units in a lot are in the same carrier but there may be multiple lots in a carrier. (* inherited from FPSINPUT.WIP_LOTS_STATIC) |
|
TOOL |
Tool is generally just the main tool. The exception is when different entities on the tool run completely independently and it is physically impossible to run wafers of the same lot across multiple entities. In this exception case, we may want to assign the entities to different eqp_types and therefore we should define each entity as a tool. Please note that when we do this there is no indication whatsoever that these different entities are on the same tool. (* inherited from FPSINPUT.EQP_TOOLS) |
|
STEP |
A single processing step within a route representing a single tool visit. Step is often a very complex string and should rarely be displayed. Instead we should use process_display. (* inherited from FPSINPUT.RTG_ROUTE_STEPS) |
|
ROUTE |
Route that has threading requirements (* inherited from FPSINPUT.RTG_STEP_THREADING) |
|
FACILITY |
Facility is included in almost every join in the DWH so this represents a definitive split. A route must have all steps on tools in the same facility. A tool must process all lots in the same facility. If your site has multiple buildings where lots run on routes using tools in multiple buildings then everything should be one facility. For example, multiple Fab buildings. But if your site has independent facilities like Fab and Test and Assembly where lot may progress from one to the next but on different routes then these should be different facilities. Since this column is in virtually every table it is critical that the value here is exactly matches what is in the MES if the MES has facility. Use facility_display for the display friendly name displayed in applications. See site_name comment for client/site/facility example. (* inherited from FPSINPUT.GEN_FACILITIES) |
|
NUM_STEPS_AWAY |
Number of steps away not including steps which we know will be skipped nor those which we estimate will be skipped at least x pct of the time. This x value is configurable in GEN_FACILITIES using the smp_pct_for_num_steps_away column. (* inherited from FPSBASE.WIP_STEP_FUTURE) |
|
SCHED_GROUP |
This is the grouping of tools and processes which the FPS Scheduler schedules together. Since this is a parent of tool via tool->process_group and a parent of process via process->process_group, by definition each tool and each process can only be in one sched group. We need all related tools and processes to be in the same sched group for efficient scheduling. One example is sinks and furnaces because of queue times and batching. Another example is for smaller facilities like Assembly or Test where we might schedule the entire facility together. (* inherited from FPSINPUT.RTG_PROCESS_GROUPS) |
|
PROCESS_GROUP |
Process group is the critical field where tools and processes come together for the purposes of Scheduler. Process group is in both EQP_TOOLS for the tools and in RTG_PROCESSES for processes. Ideally all tools that run the same set of processes with no crossover including back-up and emergency tools would be in the same process group but it is important to note that this is not technically required for Scheduler as long as all process groups are in the same sched group. (* inherited from FPSINPUT.RTG_PROCESS_GROUPS) |
|
IS_IN_NMV_PICK_LIST |
Set to Y if lot-step is within range to be displayed in NextMove Pick List according to hours/steps_to_schedule fields in GEN_FACILITIES (* inherited from FPSBASE.WIP_STEP_FUTURE) |
|
DURABLE_FAMILY |
Durable_family indicates what durable is required by the process. When multiple durables are in a family any of them can be used. Typically there is only one reticle per family and therefore the durable and durable_family are the same. The exception would be a high running product with backup reticles. However for probe cards it is common to have several cards for each product so we have several durables with the same family. (* inherited from FPSINPUT.RTG_DURABLE_FAMILIES) |
|
IS_MULTIPLE_REQUIRED |
When more than one durable family of the same durable class is assigned to the same criteria, we use this field to determine whether to choose one or whether we need all. Our default indicated by N is that any of them can be used. Occasionally certain processes require multiple durables of the same group (i.e. double reticles) and you indicate this by setting this column to Y. (* inherited from FPSINPUT.RTG_DURABLE_ASSIGNMENTS) |
|
IS_BLOCK_BY_DRBL_RANK |
|
|
DRBL_RANK |
|
|
DRBL_RANK_DISPLAY |