This view gets a snapshot of the WIP by process family used to built the WIP profile chart for longer than 8 days.
|
Column |
Comment |
|---|---|
|
DATA_INST |
|
|
FACILITY |
Facility is included in almost every join in the DWH so this represents a definitive split. A route must have all steps on tools in the same facility. A tool must process all lots in the same facility. If your site has multiple buildings where lots run on routes using tools in multiple buildings then everything should be one facility. For example, multiple Fab buildings. But if your site has independent facilities like Fab and Test and Assembly where lot may progress from one to the next but on different routes then these should be different facilities. Since this column is in virtually every table it is critical that the value here is exactly matches what is in the MES if the MES has facility. Use facility_display for the display friendly name displayed in applications. See site_name comment for client/site/facility example. (* inherited from FPSINPUT.GEN_FACILITIES) |
|
PROCESS_FAMILY |
See https://help.inficonims.com/display/DW/Guide+to+Process+Families. (* inherited from FPSINPUT.RTG_PROCESS_FAMILIES) |
|
BANK |
Lots which are not on a route are considered in a bank and the bank name indicates why the lot is off route. Bank must be NA for lots which are on a route. Our standard filter for active lots is bank = NA. (* inherited from FPSINPUT.RTG_BANKS) |
|
PROCESS_STATE |
Process state is the most commonly used level of our Enhanced Cycle Time hierarchy. This displays on Dashboard, Scheduler, Cycle Time Analyzer, and Finished Lot Cycle Time Reporter. Process state is the parent of ECT state, however, there is configuration for when to show the process state of Reserved in each application which is done in WIP_ECT_STATES. (* inherited from FPSADMIN.WIP_PROCESS_STATES) |
|
QTY |
Quantity of units in the lot according the qty_unit defined for the facility. It is required for all lots in each facility to have their qty defined in the same units therefore the change in the unit is critical to defining the facility. For example, a pretest facility might have a sort step in the middle where we learn the qty of die. Prior to this step we know only the wafer qty but after this step we know both wafer and die. Since wafer is the only qty we know throughput the flow then wafer must be defined as the qty unit for this facility. Die can then be populated as sec_qty when it is known. Similarly the wafer saw facility might have a step in the middle where we cut the wafers into die. After this step we no longer know the number of wafers which means that die must be the qty unit for this facility and wafers can be the sec_qty prior to the saw step. Please note that a lot with qty of 0 is allowed but only if the sec_qty is greater than 0. This is unusual but one case is where we know the wafers will be scrapped but cannot be scrapped quite yet. (* inherited from FPSINPUT.WIP_EVENT_HIST) |